Los Angeles Metrolink — a 512-mile commuter rail system, which serves the Southern California counties of Los Angeles, Orange, Riverside, San Bernadino and Ventura — is moving to be the first railroad to install and implement a positive train control (PTC) system.
PTC is collision avoidance technology that monitors and controls train movements remotely, can prevent train-to-train collisions, prevent unauthorized train movement into a work zone, halt movement of a train through a switch left in the wrong position, and stop trains exceeding authorized speeds.
Congress has mandated that freight and passenger railroads install PTC on designated lines by Dec. 31, 2015.
To view an animated depiction of how PTC works as a safety overlay system to improve railroad safety, click here.
Related News
- Santa Monica Local Wins Cost of Living Increases
- Senate Hearing Indicates Trouble for Public Transportation
- REMINDER: Registration Open for Anaheim Regional Training Seminar
- 2025 National Agreement Freight Negotiations Update from President Ferguson
- NRLC Bargaining Chart
- Brother Bill Link Retires After a Memorable 53 Year Career
- Bad Actors to be Restrained Thanks to New SMART-TD-backed Transit Bill
- Nebraska Reforms Standards for Rail Crew Transportation
- Show Your Pride, Win Shirts for Your Entire Local
- Local Pride T-Shirt Contest Rules