
Last fall, SMART General President Joseph Sellers traveled to UBS Arena, then still in progress, to tour and meet members working on the brand-new, $1.5 billion multipurpose home of the New York Islanders, which opened on November 20, 2021. Watch the video of their trip to see how our entire union – including sheet metal, testing and balancing, sign installation and Transportation Division members – came together to construct UBS Arena, as well as track for a new rail station serving the stadium.
Unique to this project was the presence of SMART members from across our union, including Local 137 sign members who installed the giant center ice board, as well as signage around the arena and in the new train station built to handle swarms of fans from across Long Island and the NY metropolitan area.
SMART-TD members led the way in constructing the Long Island Rail Road track leading to the new station. SMART Local 28 sheet metal workers installed all parts of the HVAC system, including ductwork, rooftop units, fans, fire dampers and smoke purge systems. SMART members also installed architectural features, including roofing and decking, and specialty work such as kitchen equipment, lockers and toilet partitions.
Read more about the project:
Sheet metal and TD members have hands in UBS Arena project
Related News
- CSX Asks to keep Safety Reports out of the Crew Rooms, Injuries are Up, Fatalities Continue, and Transparency is Down
- WE WILL NOT “SHUT THE !#*$ UP AND DRIVE”!
- Railroad Retirement Benefits Set to Increase in January
- Semi Crushes Member in Decatur, Ill.
- Long-time Union Ally Mikie Sherrill Runs for New Jersey Governor
- FRA Suspends Safety Reports due to Government Shutdown
- SMART-TD to Port Terminal Railroad Association: Your Harassment Stops Now.
- Honoring the Professional Drivers Who Keep Our Children Safe
- Report Transit Assaults to Help SMART-TD Fight Back
- SMART, SMACNA cohost webinar on building success in residential HVAC